Monday, June 13, 2011

Function Theory (Teori Fungsi)

arisitek muda

ANALYSIS 

BUILDING TASK 


A. Physical control 


The building is situated in a location close to the mountains because the function of the building as a building kptsp Lampung province, building one-stop integrated service offices Lampung province, the building is situated on the road p.antasari km, 5 Lampung.
a. Climate 



The wind will bring positive effects on the walls of buildings directly related to him, climatic conditions also be adjusted with the physical design of buildings, ie the enable for the winds that pass can be oriented optimally into the building. Also by planting trees for the wind to the bend into the building.
1. high rainfall 2.high3. Hot air temperatures up to delicious 4. Wind (air flow) slightly 5. Moderate to strong solar radiation 6. Small heat exchange due to high humidity (the air is saturated by water vapor), so that water does not easily evaporate.
so there are many savanna or grassland and shrubs. The problem is to keep air flowing so that evaporation can be continued.
The main strategy for building: - Block direct solar radiation and sun shading louvers (pembayang sunlight) - Isolation of heat radiation with the air space (on the roof and use of cell materials and porous or hollow) - Distance of buildings with other buildings much to smooth the air flow - Thermic comfort is achieved with air flow on the human body. - Stopping / isolation radiation with reflector less appropriate because it will add to hot environment and reduce the application of moisture and evaporation. - The materials used should have a small BJ (mild), time lag is low, a small heat capacity, small dimension, small weight of its own, to follow the surrounding air humidity levels and low thermal conductivity.
B. Lighting 


Lighting system is one factor which affects the visual comfort of a building. Lighting system is very important in office buildings to enhance productivity and comfort while working. Lighting system lighting system includes natural and artificial lighting systems. Some of the matters governed by the Procedure Lighting System Design Experience in Building Construction is as follows: Comparison of levels of natural lighting in the room and natural lighting on the field even in the open field is determined by the geometric relationship between the measuring point and skylight, the size and position of the light hole , the distribution of bright sky, and the sky can be seen from the point of measurement. 












































































No comments:

Post a Comment

sigitpramana - ARCHITECTS.

Powered by Blogger.
 
Return to top of page Copyright © 2010 | Sigit Pramana Putra Converted into Blogger Template by HackTutors